Contractors Professional Liability Coverage Highlights

Benefits

  • Designed specifically for contractors with design-build or construction management responsibilities
  • Claims and underwriting expertise
  • Broad regional network provides access to underwriters knowledgeable about local issues
  • Flexible underwriting approach
  • Chubb’s financial strength

Coverage

  • Free pre-claim assistance
  • Broad definition of professional services
  • Contractors Pollution Liability coverage
  • Blanket additional insured status for all clients of Named Insured for pollution incidents
  • Joint venture coverage
  • Predecessor firm coverage
  • Supplemental coverage for Insured expense reimbursement of $300 per day
  • Innocent insureds coverage
  • 60-day automatic extended reporting period
  • Punitive damages with most favorable venue
  • Three year optional extended reporting period
  • Claims-made coverage with circumstance reporting provision
  • Claims mediation credit up to $25,000
  • Supplemental coverage for ADA and FFHA fines, sanctions, or penalties
  • No lead or asbestos exclusion
  • Specific project excess limits
  • Primary and excess coverage available
  • Automatic subsidiary coverage
  • Worldwide coverage


Target Clients

U.S. domiciled contracting firms that are qualified to engage in the design and construction of traditional building construction, infrastructure, and land development projects and are responsible for providing the following services:

  • Design/build (self-performed design)
  • Design/build (non-self-performed design)
  • Design delegation
  • Construction management (at risk)
  • Construction management (agency)
  • Self performed design

Claims Scenarios

A contractor was hired to build a call center using design-build project delivery. The General Contractor retained a design professional to design the facility and successfully secured indemnification and hold harmless agreements in the contract. At the completion of the construction phase, it was discovered that insufficient design of the utility conduits prevented certification of the facility, resulting in significant delays. By the time suit had been brought the design professional declared bankruptcy and the general contractor was unable to enforce the indemnity agreement. The contracting firm incurred $1.5 million in defense and indemnity costs.

A general contractor was retained by a biopharmaceutical firm to design and build a “state of the art” process facility. Cracks appeared in the ground floor slab approximately one year post completion. After extensive forensic research it was determined that the slab was under-designed and was unable to support the manufacturing equipment. The cost for slab replacement exceeded $600,000.

A construction management firm responsible for the management of multiple subcontractors failed to adhere to change order provisions in the client contract. The failure to coordinate, manage and report changes to the owner resulted in project delays and contingent business interruption damages in the amount of $570,000.

Seeking a Contractors Professional Liability Quote?

We can help with that. 

Get a Quote